Rank: Newbie
Groups: Registered
Joined: 11/11/2016(UTC) Posts: 6 Location: dsad
|
fans and other equipment, the boom layout is completed; ceiling ventilation, water pipes and the ceiling of the pedestrian pedestrian or Safety channel, should be installed, the fire pipe installation and commissioning completed; ceiling light groove, bracing, scissors, etc., should be based on the appropriate layout of the project. 2, laying direction Gypsum plaster board from one end of the ceiling began to staggered installation, arranged by the block, the balance on the final installation, gypsum board long side and sub-keel was cross-state (with the main keel parallel). Adjacent two gypsum board in the same keel lap width should be basically the same, the installation should be set aside in the board about 3 mm gap. Figure 3, Cheap Price Wpc Fence,Corrosion Resistant Outdoor Deck Suppliersreplacing decking with composite deckingfree building plans for floor roof over a decklaminate flooring for outdoor porch
|
|
|
|
Users browsing this topic |
Guest (2)
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.