web statistics
boom layout is completed - AAM ADMI KA PAKISTAN - AAP AUR ARY - Forum
Welcome Guest! To enable all features please Login or Register.
Options
Go to last post Go to first unread
qizhen0809  
#1 Posted : Friday, November 11, 2016 11:09:03 AM(UTC)
qizhen0809

Rank: Newbie

Groups: Registered
Joined: 11/11/2016(UTC)
Posts: 6
Australia
Location: dsad

fans and other equipment, the boom layout is completed; ceiling ventilation, water pipes and the ceiling of the pedestrian pedestrian or Safety channel, should be installed, the fire pipe installation and commissioning completed; ceiling light groove, bracing, scissors,

etc., should be based on the appropriate layout of the project. 2, laying direction Gypsum plaster board from one end of the ceiling began to staggered installation, arranged by the block,

the balance on the final installation, gypsum board long side and sub-keel was cross-state (with the main keel parallel). Adjacent two gypsum board in the same keel lap width should be basically the same, the installation should be set aside in the board about 3 mm gap. Figure 3,
Cheap Price Wpc Fence,Corrosion Resistant Outdoor Deck Suppliers
replacing decking with composite decking
free building plans for floor roof over a deck
laminate flooring for outdoor porch
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Notification

Icon
Error