web statistics
ground should also pay attention wpc floor - AAM ADMI KA PAKISTAN - AAP AUR ARY - Forum
Welcome Guest! To enable all features please Login or Register.
Options
Go to last post Go to first unread
qizhen0809  
#1 Posted : Tuesday, April 18, 2017 7:45:26 AM(UTC)
qizhen0809

Rank: Newbie

Groups: Registered
Joined: 11/11/2016(UTC)
Posts: 6
Australia
Location: dsad

to strengthen the floor paving method: suspended laying strengthen the use of suspended floor laying, the laying of floating method is not directly fixed on the ground floor, usually on the ground to find after level, covered with moisture-proof pad, then directly above the floor is laid. The first step: to deal with the ground floor pavement to strengthen the floor, you need to ensure that the ground level and dry.

The ground floor rate needs to be up to standard, the rough room floor generally do cement ground leveling. The moisture content of the ground should also pay attention to, if the moisture content is too high, need to do moistureproof treatment. The second step: laying the ground mat cushion is moisture-proof,

mute. In the laying of the floor before the strengthening of the ground floor pad. General pad placement to smooth without overlapping covered the entire laying on the ground, the joint application of adhesive tape tightly. The ground and wet geothermal environment should be the lower pad fortify wet film, the width of joints shall be above 200mm and overlap with adhesive tape tightly, the corner turned up with the same baseboard height.
Best WPC Supplier | Composite Deck | Seven Trust
composite plank board
wood privacy fence calculator
2x6x8 untreated home depot
Users browsing this topic
Guest (2)
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Notification

Icon
Error