In this study we tried to highlight events and difficulties to construct tidal power plant and their simple solutions. The design for gharo tidal power plant is described. Gharo tidal power plant can be first experiment in tidal industry. This experiment gives understanding of required techniques to construct larger tidal power plant. the bulb turbine can be used in real site and its all parameters like generator and propeller design.. In this study we want to give some observed and calculated data of gharo creek. In this study we assumed the efficiency of our plant is 30% . Gharo tidal power plant if installed can fulfil the requirement of more than 30 lack houses. This will be great achievement for Pakistan. As our country facing huge energy crises.We have to move toward renewable and green energy. Name of creek Tidal range Turbine installation length Basin area (km²) sunmiani hor 2.7 2.34km 306.4 Khor kalamat 2.4 1.16km 361 Gharo creek 3.2 60 m 2.228 Near port qasim 3.1 multi basin 110
Shown below are calculated results for different creeks at 30% efficiency with variable tidal ranges. The efficiency can be increased using different techniques and modelling of generator [center] name of creek 1 meter 2 meter 3 meter 4 meter 5 meter sunmiani hor 10.6MW 42.79MW 96.27MW 171.1MW 267MW khor kalamat 12.6MW 50.41MW 113.4MW 201.6MW 267.4MW gharo 0.07MW 0.31MW 0.74 MW 1.24MW 1.94MW Near port Qasim 3.8MW 15.34MW 34.51MW 61.37MW 95.89MW It is fact that we are in the world where almost 80% of the demanding energy is furnished by coal, oil, gas and hydro power plant. Now this is a time for renewable energy resource to fulfil our country needs.Pakistan nearly consists of 1545 km of coastal length. We can generate electricity through different method as world is utilizing this energy. Now it’s time to implement some modern technique and expertise on these explored sites to generate electricity. Harnessing Tidal energy is one the modern techniques.In this study we compare small scale model with large creek. by using our simulation model we can generate 300 MW at 30% efficiency of our system. Using modern techniques and efficient turbine installation can increase sites efficiency.We explore three of these sites but there are many sites available to harness tidal energy. In this study the complete design to install number of turbines and length for installing turbines is illustrated. i know our government policies but i can think for the development of pakistan . it was our final year project research report .includes cost estimation time required to build tidal power plant and 3d design of final product.for further information please contact me.
|
|
|
|
Users browsing this topic |
Guest
|
AAP AUR ARY
»
APP AUR ARY
»
AAM ADMI KA PAKISTAN
»
Generation of electricity using tidal energy for government of Pakistan
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.